Reliable Water on Dryside

11/15/2018

Construction has started on a $5.1 milion pipeline to bring reliable, potable water to Dryside residents. It’s the first delivery of Animas-La Plata Project water to the area.

Learn More...

Read the Full Transcript

PAST DURANGO LOCAL NEWS STORIES

December 22, 2023

Need more  Local DURANGO News?

News for Locals. By Locals.
Editorial Policy | Copyright © Local News Network Inc. All Rights Reserved. | Privacy Policy